







My plan is to load the customer's second quilt onto my long arm this weekend, ready to quilt it on Monday. This weekend I will stitch the strawberry section of my UFO challenge cross stitch piece.




August is definitely over and it's much cooler, allowing us to get back to our sewing rooms. I've had three lovely packages this week. Three more are in the post with one more to follow. I love all of the fabrics - Karen Lewis, Lizzy's House and Alison Glass seem popular choices to us.
Don't the blocks received so far look great together. I think I'll have enough to make a ladder quilt and perhaps two quilts to donate for Quilts for Care Leavers.
I received two customer quilts on Monday and will start working on them today, then I have two more to call in. I don't like too many piling up as it makes me anxious. I also have a table runner to quilt for Lizzie and then my star quilts towards the end of the month.

It' bad news for my Atelier 7, it can't be fixed locally so needs to be sent to England for repair. I need to review my options and decide what to do. In the meantime, I have used my Siger featherweight to make these blocks for the Stash Bee for Anne. I have made this block before so spent two hours making five pairs of blocks for Anne which were posted yesterday.
The tutorial for the block can be found here.

I am very pleased that my attempt to stitch month 3 of the Liminal Quilt by Jo Averry for Love Patchwork and Quilting on my Singer Featherweight was successful. When my Atelier 7 comes back from the spa, I'd like to stitch the three parts together. I am using the kit from A Beautiful Thing. There is insufficient fabric to stitch long borders to one element of month 2 so I will have to accept that I will have to put a seam in the border.


I had just started stitching month 3 of Liminal quilt on Tuesday when I couldn't raise the needle. Very annoying. Lizzie was visiting for a few days so she dropped me at the opticians and then dropped off my Atelier 7 to our local dealer for a service. I am going to have to be patient as Rachel has six machines to service before the school term starts and she is closed for two days this bank holiday weekend.




After returning my my third hospital appointment of the week on Friday, I was delighted to receive Gill’s two blocks. They are all going to look so fabulous together.














I dislike being behind on a block of the month, so finishing month 1 of the liminal quit medallion BOM by Jo Avery for Love Patchwork and Quilting was a priority this week. It is out of my comfort zone so there was quite a bit of unpicking.



I decided to treat myself to an annual subscription to Love Patchwork and Quilting and a kit from A Beautiful Thing to make Jo Avery's Liminal quilt. I had hoped to stitch the first block at the Modern Quilt Club retreat on 17 July but the kit arrived as we pulled out of the garage to head to the airport, so I left it behind.
There was no colour key in either the kit or the magazine, so my first task was to make my own colour key. Then I matched the colour key with the fabric, labelled the fabrics with my homemade alphabet pins and cut a swatch from the fabric which I stuck to the colour key.





This foundation pieced skull quilt designed by Helen Creasey has been completed for a few years. It is now out of the drawer and ready to be Graffiti Quilted. My plan is to multiple different pink threads for the background and quilt a different motif in each section. Energy is what I lack to get projects finished, so I plan to quilt two matching sections each day and hope to see some good progress over the next few months.



